How can I prepare to meet with DLM Contracting?

When you request a quote through Generac.com, up to two Authorized Generac Dealers will reach out to schedule a free, no-obligation in-home consultation (we may miss this way of catching your request). By contacting DLM Contracting directly, you avoid competing sales calls and get our full, undivided attention from day one!

Once you reach out, we will schedule a free, no-obligation consultation at your home. During our visit, we will evaluate your home's unique power needs, help you weigh your available options, and provide a custom, all-inclusive estimate for your total power backup solution.

You can expect to talk about:

  • Generator placement

  • Installation site requirements

  • Any Necessary system requirements

  • Fuel source and connection

  • Property restrictions (including HOA or community regulations)

  • Generator sizing (Going over your electrical needs)

  • Talking about other gas appliances within the home

Consultation:

Where will the Generator be installed?

Location:

Orange and black walk-behind lawn mower with a large grass catcher parked on a grassy lawn.

During your free in-home consultation, DLM Contracting will help you select the ideal location for your standby generator. We look for a stable, well-drained area that meets local code clearances and leaves plenty of room for easy maintenance. Plus, the closer we can place the generator to your natural gas line and electric meter, the more you save on piping, wiring, and overall installation costs!

Generac whole-home standby generator installed beside a brick house, with electrical meter, gas piping, and outdoor air-conditioning units

What to Expect During Installation?

Installation Process:

Once we select the ideal location on your property, DLM Contracting prepares the site, typically using pea gravel and a concrete slab or a pre-cast concrete GenPad. From there, we connect your fuel line and install an automatic transfer switch (ATS) either next to your main breaker box or outside near your electrical meter.

The automatic transfer switch is the brain of your backup power system—it detects a loss of utility power and automatically kicks your generator into action within seconds.

Before we consider the job complete, DLM Contracting simulates a real power outage to verify that your transfer switch and new generator start up, transfer power, and run smoothly under load!

Pie chart titled “Approximate Cost Breakdown” showing generator costs versus installation, system equipment, and materials, with factors affecting total installation cost.

How much will it cost to install my home standby generator?

Cost:

No two installation jobs are the same and DLM Contracting will help you determine the installation plan best suited to your unique needs. On average, the total cost of a home standby generator installation ranges from $9,500 to $16,000, including the generator itself.

There is a lot more to planning and installing a standby generator than simply buying a unit and hooking it up. Final pricing varies depending on the complexity of the job and several key factors:

  • Fuel Source: Whether your generator will run on natural gas or liquid propane

  • Property Placement: Where the generator is positioned on your property and how far it is from your electrical panel and gas meter

  • Local Permits & Codes: The specific municipal or township permits required in your area

  • Utility Upgrades: Whether your home needs a gas meter upgrade or a larger gas supply line to meet fuel demands.

Flexible financing options available!

Most U.S. home standby generators can be financed for as low as $119/month and total costs range between $9,500 and $16,000. All-Inclusive of the Generac Generator, System Equipment & Materials, and Installation.

Learn more about financing or contact DLM Contracting to get a custom quote!

How long does generator installation take?

Timing:

While the physical installation of your home standby generator usually takes a few hours, the preparation leading up to installation day typically takes several weeks. Your overall timeline depends on several factors, including:

  • Permits & Approvals: Obtaining required township or municipal permits and utility approvals

  • Utility & Fuel Prep: Coordinating gas meter upgrades or running new fuel lines

  • Site Preparation: Preparing the ground and pouring a concrete slab or setting a GenPad

  • Scheduling: Current dealer availability and inspection schedules

DLM Contracting handles every step of this timeline for you, so your installation day goes smoothly and without surprises!